Willis.Cut
Index 001 · Crothersville, IN · 2026

We open
the corridor.

Pipeline mainline, transmission corridor, highway right-of-way, energy development. Fourth Generation Loggers. Highly skilled operators. 25 years cutting for major utilities and pipeline GCs · zero reportable incidents in 24 months.

01
230mi
Pipeline ROW cut · last 12 months
02
80mi
Transmission ROW cut · last 12 months
03
1,100
Acres cleared · last 12 months
04
0
Reportable incidents · last 24 months
¶ 01 — Thesis

Safety first. Production right behind it. A production-felling fleet and decades-deep operators clearing pipeline, transmission, highway, and energy-development corridors east of the Colorado River.

The schedule holds, the safety record holds, the corridor opens. That's been the posture for 25 years — OSHA 30 + SAFER on every site, energized-line clearance protocols honored, $5M GL over every project. The Indiana shop carries the largest barsaw in the country plus a TimberPro feller buncher, a Tigercat skidder, and track mulchers. End markets: midstream operators, IOUs, rural co-ops, DOTs, energy-development GCs, veneer mills, and stave operators.

¶ 02 — Footprint

37 states.
One phone number.

Anchor
IN
Indiana shop · since 1999
Tenure
25+
Years cutting for utilities + pipeline GCs
Footprint
37
Any state east of the Colorado
Safety
0
Reportable incidents · last 24 months
¶ 03 — Last 12 Months

On the deck.

Linear footage and acreage cut in the past 12 months. Verified, not aspirational.

230mi
Pipeline ROW
80mi
Transmission ROW
500ac
Solar field
200ac
Rock quarry
400ac
Housing + industrial development
0
Reportable incidents · 24 months
25+
Years for utilities + pipeline GCs
37
States east of the Colorado
¶ 04 — Field Reports

Recent work.

400-Acre Solar Field — Lebanon, KY
KY·Site · 400 ac·solar field

400-Acre Solar Field — Lebanon, KY

Completed the complex cutting for a client developing a 400-acre solar field in Lebanon, Kentucky.

40-Mile Duke Energy Pipeline ROW — Fayetteville, NC
NC·Linear · 40 mi·pipeline corridor

40-Mile Duke Energy Pipeline ROW — Fayetteville, NC

Supplied machines and owner-operators to a client cutting 40 miles of pipeline right-of-way for a Duke Energy project.

216-Mile Kinder Morgan Pipeline — Texas
TX·Linear · 216 mi·pipeline corridor

216-Mile Kinder Morgan Pipeline — Texas

Provided two owner-operators running Hotsaw machines to assist the contractor clearing a 216-mile Kinder Morgan pipeline corridor in Texas.

Highway Roadside Cutback — TN / GA
TN·Linear · Multi-state·highway cutback

Highway Roadside Cutback — TN / GA

From downtown Atlanta to the mountains of Tennessee — DOT roadside tree clearing handled by our fleet of fellerbunchers.

Powerline Clearing — Midwest Utilities
MIDWEST·Linear · Various·transmission utility

Powerline Clearing — Midwest Utilities

Various powerline clearing projects for utility clients across the Midwest.

24″ Water Main ROW — Ft Knox, KY
KY·Linear · 5 mi·right of way

24″ Water Main ROW — Ft Knox, KY

Cut the right-of-way for a client installing a new 24-inch water main, five miles long, at Ft Knox.

↳ Tap to CallContact / Send Plans →
¶ 05 — Engage

Ready to clear?

(317) 563-2404
Call — (317) 563-2404